Project Info
Project Description
This job entailed: Installation of telecom racks to raised floor environment, furnish/install 19” 400 amp Eltek power plant and used this plant to power fuse panels and Ciena switch equipment in the neighboring racks. Also installed ADC fiber management above and along side racks for fiber cabling.